hey charles just heard somebody give a shout out to tyler savery from sirius buzz.com on the stern wrap up show lol funny some how he crammed it in while talking about the dodge challenger with ronnie.
hey charles just heard somebody give a shout out to tyler savery from sirius buzz.com on the stern wrap up show lol funny some how he crammed it in while talking about the dodge challenger with ronnie.
Here's the contract... this was the launch contract for XM-3 and XM-4, with an option for XM-5; which XM exercised in August of 2006. The satellite was to be delivered in 2008 and launched in early 2009, but XM has delayed this to early 2010 as it was not necessary. To go along with this delay, XM deferred final payments on XM-5 to the earliest of post-launch or January 2010.
http://www.sec.gov/Archives/edgar/da...93/dex1055.txt
Even if more payments were made, I'd be shocked if more than 50% of the launch costs were prepaid at this point. Even still, any suitor to SeaLaunch assets would see the XM launch as an asset as well -- and would do what it takes to secure this XM launch.
---------
Charles LaRocca
SiriusBuzz Founder
wasnt the discussion about the sirius launch this year? i had brought it up one day after the Q1 CC about whether this years bird launch was paid for or whether we'd get hit with another big CAPEX expense. irish and tyler both said this years launch was paid for and there was an arbitration hearing with sirius trying to get some money back.. then talk transformed to next years launch which could be postponed...if im wrong please correct me.
i was barely listening and then i heard "tyler savery from siriusbuzz", im pretty sure he some how brought it up while talking about the dodge challenger with ronnie. yes it was a caller.
I am just going to say the same thing I said before to you guys. It has always been done that they do not pay for the launch and even the satellites before the launch. That is is almost all pushed back or deferred. So when they said that it was paid for, I had some real problems with it.
Remember everyone, we're talking about two different launches here -- with two different launch providers and two different companies.
Sirius and ILS is coming up next week... undoubtedly, most of that payment is paid. With maybe a small payment remaining.
XM and SeaLaunch is a year out... which could be delayed further. I would suspect that most of that payment is still to be made because it has a fluid launch date. The Sirius date had to be done as soon as possible, as it is essentially a replacement satellite. The XM launch is as a "spare". So the launch date is fluid. This undoubtedly means that the bulk of the payments by XM have not been made yet.
2 launches, 2 launch companies and 2 satellite providers... 2 different situations.
-------
REPLACEMENT for what the orbital life span for them takes them into 2015. The only problems I recall they were having on those was some secondary circuitry for the solar panels.
I will just remind you that most of the time the launches are not paid for until after the launch. XMSRs last launch is a perfect example they were paying for that one into the second year after the launch.
P.S. Dont give me trouble over this, I need this reason to rip johnny a new asshole.