Page 47 of 77 ... 37454647484957 ...
Results 461 to 470 of 761
  1. imromo24 is offline
    Guru
    imromo24's Avatar
    Joined: Aug 2008 Location: Steeler Town, MI Posts: 2,524
    08-13-2009, 03:48 PM #461

    spng

    should be expecting a spng report soon could explain the 5% increase today on anticipation. Should be announcing the 1/2 way point orders for august, probably monday, last one was 3rd thursday on july 16th.

  2. Sean is offline
    Senior Member
    Sean's Avatar
    Joined: Jun 2009 Posts: 395
    08-13-2009, 03:48 PM #462
    1more hour to go at work
    at least tomorrow is friday but then monday comes again :S

  3. bigsandy is offline
    Enthusiast
    bigsandy's Avatar
    Joined: Jun 2009 Posts: 192
    08-13-2009, 03:51 PM #463

    Evfl

    Hey, what's with the 10,000,000 share buy hanging out there on EVFL? MM is ARCA, popped up at 2:38 p.m. Interesting.

  4. Los Tiburones is offline
    Mentor
    Los Tiburones's Avatar
    Joined: Feb 2009 Location: California Posts: 1,015
    08-13-2009, 03:55 PM #464
    Quote Originally Posted by ShotsII View Post
    Quasar Aerospace Industries, Inc. Announces Herlong Airport Facility Construction Agreement
    QASP13:39 EDTMarketwire
    JACKSONVILLE, FL -- (Marketwire) -- 08/13/09 -- Quasar Aerospace Industries, Inc. (PINKSHEETS: QASP) (formerly) Equus Resources, Inc. (EQUR).

    Quasar Aerospace announced that the contracts for the Herlong Airport Project have been signed with the Project Manager/General Contractor, the Civil Engineering firm and the Architect.

    The Company has selected the Dakota & Company of Jacksonville as the general contractor. This firm has been the developer and builder of several exceptional airport projects. Mr. Fred Dewitt, the company president, will oversee all engineering, design and construction for the maintenance hangar, office building and site development. Their website is www.dakotaandcompany.com. Dakota and Company has recently completed the Marco Airplane Hangar.

    The civil engineering company selected for the project is Phillips Civil Engineering, and their website is www.phillipscivil.com. The architect the Company has chosen is Wharton Donaldson who is the Architect of record for the Marco Airplane Hangar and thus has a great working relationship with Dakota and Company.

    The Company is extremely pleased with the planning done by these three firms, in providing the Company with the first truly Green development on any airport in the Jacksonville area. Amongst the Green Building Initiatives will be photovoltaic electric, radiant heating and a highly insulated building. All three of these companies are excited to work with the CEO of Quasar Aerospace, Dean Bradley, who spent many years in the development/construction industry and is totally satisfied with the professionalism shown by all three of these companies.
    Beat me to it ... just pulled it from my Etrade ...

    Interesting bouncing around today, 8 mil vol.

    Hey Bill, glad to hear about the tile job ... what don't you like about the porcelain?

  5. billhart22 is offline
    Guru
    billhart22's Avatar
    Joined: Dec 2008 Posts: 4,896
    08-13-2009, 03:57 PM #465
    Quote Originally Posted by Sworntwofun View Post
    Not any more Bill... now they are covering....I got in at .05 100k shares its now at
    .059 maybe news tomorrow look at the volume in the last hour....
    Tony,
    In these last five minutes they are trying again. It could take another dip in the morning. I am just looking at level 2, so I don't know. With 5 minutes to go why even drag a chart up?

  6. billhart22 is offline
    Guru
    billhart22's Avatar
    Joined: Dec 2008 Posts: 4,896
    08-13-2009, 04:03 PM #466

  7. Sworntwofun is offline
    Addict
    Sworntwofun's Avatar
    Joined: Dec 2008 Posts: 588
    08-13-2009, 04:06 PM #467
    Quote Originally Posted by billhart22 View Post
    Tony,
    In these last five minutes they are trying again. It could take another dip in the morning. I am just looking at level 2, so I don't know. With 5 minutes to go why even drag a chart up?
    no problem but as usual as soon as i bought at .05 after waiting another week it dropped to .0425 im just glad to see it come back..... Thanks Tony

  8. Los Tiburones is offline
    Mentor
    Los Tiburones's Avatar
    Joined: Feb 2009 Location: California Posts: 1,015
    08-13-2009, 04:10 PM #468
    Quote Originally Posted by ShotsII View Post
    Quasar Aerospace Industries, Inc. Announces Herlong Airport Facility Construction Agreement
    QASP13:39 EDTMarketwire
    JACKSONVILLE, FL -- (Marketwire) -- 08/13/09 -- Quasar Aerospace Industries, Inc. (PINKSHEETS: QASP) (formerly) Equus Resources, Inc. (EQUR).

    Quasar Aerospace announced that the contracts for the Herlong Airport Project have been signed with the Project Manager/General Contractor, the Civil Engineering firm and the Architect.

    The Company has selected the Dakota & Company of Jacksonville as the general contractor. This firm has been the developer and builder of several exceptional airport projects. Mr. Fred Dewitt, the company president, will oversee all engineering, design and construction for the maintenance hangar, office building and site development. Their website is www.dakotaandcompany.com. Dakota and Company has recently completed the Marco Airplane Hangar.

    The civil engineering company selected for the project is Phillips Civil Engineering, and their website is www.phillipscivil.com. The architect the Company has chosen is Wharton Donaldson who is the Architect of record for the Marco Airplane Hangar and thus has a great working relationship with Dakota and Company.

    The Company is extremely pleased with the planning done by these three firms, in providing the Company with the first truly Green development on any airport in the Jacksonville area. Amongst the Green Building Initiatives will be photovoltaic electric, radiant heating and a highly insulated building. All three of these companies are excited to work with the CEO of Quasar Aerospace, Dean Bradley, who spent many years in the development/construction industry and is totally satisfied with the professionalism shown by all three of these companies.
    I am liking this company more and more everyday. Tangible stuff, keeping us informed ...

  9. billhart22 is offline
    Guru
    billhart22's Avatar
    Joined: Dec 2008 Posts: 4,896
    08-13-2009, 04:10 PM #469
    Quote Originally Posted by Los Tiburones View Post
    Beat me to it ... just pulled it from my Etrade ...

    Interesting bouncing around today, 8 mil vol.

    Hey Bill, glad to hear about the tile job ... what don't you like about the porcelain?
    Porcelain cracks too easy. and if you are close to the edge with a grinder it will shatter. It is really hard, but brittle stuff. I was using a true 1/4" tile. Once it is down though, it will last forever. It is some really beautiful tile (Brown/Blue/Black/Grey all throughout). Beautiful tile job by the way also!

    The plumbing is next for my steam shower and then the new tub, vanity, sink, faucet, vent, steam shower door, durock (required in a steam shower) vapor barrier, Red Dog, tile in the shower surround, countertop and some mud work and texturing and some electrical and lighting....oh ya, and a new toilet.

    There is a lot to do, but I finally got started.

  10. billhart22 is offline
    Guru
    billhart22's Avatar
    Joined: Dec 2008 Posts: 4,896
    08-13-2009, 04:13 PM #470
    Quote Originally Posted by Sworntwofun View Post
    no problem but as usual as soon as i bought at .05 after waiting another week it dropped to .0425 im just glad to see it come back..... Thanks Tony
    Tony, you are not the only one in here that happens to. (I am laughing). You can damn well bet if I buy something it will drop.

Page 47 of 77 ... 37454647484957 ...